In Tashkent, a new overpass is tested with a load of 300 tons

Local

image

In Tashkent, a new overpass has been tested with a load of 300 tons. The first stage of construction and installation of the overpass, connecting Babur Street and Tashkent International Airport in Tashkent, has been completed. This was reported by the Ministry of Transport.


It is reported that the overpass underwent practical testing. Four auto trailers, each weighing 35 tons, and four military tanks, each weighing 40 tons, were transferred over it, totaling a load of 300 tons.


According to the test results, the overpass's strength was determined to be able to withstand a load greater than the specified amount.


Tags

Toshkent yangi yo'l o'tkazgich

Rate Count

0

Rating

3

Rate this article

Share with your friends