In Tashkent, a new overpass is tested with a load of 300 tons
Local
−
07 November 2023 8467 1 minute
In Tashkent, a new overpass has been tested with a load of 300 tons. The first stage of construction and installation of the overpass, connecting Babur Street and Tashkent International Airport in Tashkent, has been completed. This was reported by the Ministry of Transport.
It is reported that the overpass underwent practical testing. Four auto trailers, each weighing 35 tons, and four military tanks, each weighing 40 tons, were transferred over it, totaling a load of 300 tons.
According to the test results, the overpass's strength was determined to be able to withstand a load greater than the specified amount.
Live
AllSamarqandda 17 yoshli yigitning o'limiga sababchi bo'lgan profilaktika inspektori qamaldi
12 December
Akademik Abdulla Ubaydullaev vafot etdi
12 December
Trampning Minecraft'dagi personaji e'lon qilindi
12 December
Shifokor retseptisiz beriladigan asosiy dori vositalarining ro'yxati shakllantirilgan – vazirlik
12 December
Ayrim bemorlar alohida nazoratda bo'ladi – SSV
12 December